
Project
Quay construction Smulders - Flushing - Smet Group Nederland BV – HTAB101,6 and HTAB114,3
For our valued client Smet Group Nederland BV, we were commissioned to supply the materials for anchoring a quay construction on the Smulders site in Vlissingen. Smet-F&C successfully applied 237 heavy-duty self-drilling anchors with diameters of 101.6 and 114.3 mm and increasing lengths up to 49.0 meters long. In total, this involved approximately 600 tons of anchor materials.